Virtual Tour
Labels: Ryan's House
I built a house on my brother's property in Campbell River. I documented the whole process from excavation to completion on this blog
Labels: Ryan's House

Here is the almost finished bathroom; it just lacks the toilet, the sink, and the showerheads which the plumber will install on Friday. I will have the time lapse of the installation of the glass block wall just as soon as I get a few hours free time. And at this stage I have very little free time left (we are leaving for Kyuquot on Sunday to build two more houses).
Don helped us out for a few days installing the bamboo floor and assembling all the cabinets. The reason he looks disembodied in the photo is because it is I stitched two photos together to get it all in but Don was only in one of them. The past few days have been getting many of the little things done: I finished off the new access hole to the basement, put down subfloor and layed out the heating pad in the main bathroom, poured the concrete base for the walk-in shower, installed all the screens on the windows, finished drywalling behind the shower, and I finished off the fence in the front yard, just to name a few.
The next few days I will be concentrating on putting in the tiles. I'm eager to get going on the glass blocks (watch for the time-lapse on that one) but have a few stages of preparation left before they can start.
There is a lot going on with the electricians all over the house and insulators in the crawlspace. This is the base for the shower. as you can see the evening sun beams through the windows and through what will be the glass blocks. I think it'll look cool. I might have to try it out when it's done.